Talk:List of commercial nuclear reactors
This is the talk page for discussing improvements to the List of commercial nuclear reactors article. This is not a forum for general discussion of the article's subject. |
Article policies
|
Find sources: Google (books · news · scholar · free images · WP refs) · FENS · JSTOR · TWL |
Archives: 1Auto-archiving period: 12 months |
This article is rated List-class on Wikipedia's content assessment scale. It is of interest to the following WikiProjects: | |||||||||||||||||||||||||||||||
|
Article history | |||||
|
Canada
[edit]Reference to the little known slowpoke at tunney's pasture http://www.cnsc-ccsn.gc.ca/fr/commission/pdf/trans-03-H14.pdf
St. Lucie plant
[edit]What happened to the St. Lucie NPP? [1] I will research it and add it in. 216.164.138.57 16:31, 24 Jun 2005 (UTC)
Someone will still have to modify the NRC Region 2 template. 216.164.138.57 17:01, 24 Jun 2005 (UTC)
Lianjiang Unit 1 and 2 is already under construction
[edit]Lianjiang Unit 1 and 2 is already under construction.
Lianjiang Unit 1 Begin building at 2022/09/28 https://www.cnnpn.cn/article/32918.html
Lianjiang Unit 2 Begin building at 2023/04/15 https://www.cnnpn.cn/article/36309.html 2001:B011:C040:2444:989B:6271:875:3A3C (talk) 17:45, 13 June 2023 (UTC)
- Lufeng 6 Begin building 26 Aug 2023
- Also Shidaowan has 2 Units of CAP1400 under construction since 2019 .
- Not be confuse with the 2 new planned Hualong One on the same plant.
- They are different Units. 2001:B011:C040:39F9:6DF2:29B0:F883:635B (talk) 17:57, 29 August 2023 (UTC)
- Construction of first unit at Lianjiang under way
- https://www.world-nuclear-news.org/Articles/Construction-of-first-unit-at-Lianjiang-under-way
- Also the list is missing 2 new planned Hualong One at Shidaowan. 2001:B011:C040:1AD4:F142:B19E:2DF0:4B34 (talk) 18:29, 12 October 2023 (UTC)
- Xudabao Unit 1 began construction at 15 November 2023
- https://www.world-nuclear-news.org/Articles/Work-on-Xudabao-unit-1-gets-under-way 2001:B011:C008:1B61:28CC:9261:A1C8:5F27 (talk) 16:20, 16 November 2023 (UTC)
- Zhangzhou unit 3
- CNNC has now announced that work on Phase II has commenced, with the pouring of first concrete for the nuclear island of Zhangzhou unit 3 on 22 February.
- https://www.world-nuclear-news.org/Articles/Construction-starts-on-second-phase-of-Zhangzhou-p
- Jinqimen nuclear power plant
- https://www.world-nuclear-news.org/Articles/Preparations-begin-for-new-Chinese-plant 2001:B011:C008:59F2:70E8:8728:1AE2:27AC (talk) 16:53, 22 February 2024 (UTC)
- Shidaowan II-1 and Shidaowan II-2 are currently Under construction , not Planned.
- Shidaowan II-1 CAP1400 Construction Start 19 June 2019
- https://www.world-nuclear.org/reactor/default.aspx/SHIDAOWAN-1
- Shidaowan II-2 CAP1400 Construction Start 21 April 2020
- https://www.world-nuclear.org/reactor/default.aspx/SHIDAOWAN-2
- Shidaowan Units under const. 2 × 1400 MW
- https://en.wikipedia.org/wiki/Shidao_Bay_Nuclear_Power_Plant 2001:B011:C008:1AA2:8172:3AA6:C813:14B6 (talk) 17:54, 27 February 2024 (UTC)
- Unit 2 of the Shin Hanul nuclear power plant in South Korea has entered commercial operation
- https://www.world-nuclear-news.org/Articles/Fourth-Korean-APR-1400-begins-commercial-operation 2001:B011:C008:5658:5DB3:8381:66E1:6A1D (talk) 15:21, 8 April 2024 (UTC)
- Construction starts on Xudabao 2
- https://www.world-nuclear-news.org/Articles/Construction-starts-on-Xudabao-2 2001:B011:C008:939C:6E:9625:CD95:675A (talk) 14:48, 17 July 2024 (UTC)
- Construction starts on two new Chinese units
- Unit 5 at the Ningde nuclear power plant and Unit 1 of the Shidaowan plant.
- https://www.world-nuclear-news.org/Articles/Construction-starts-on-two-new-Chinese-units
- btw Shidaowan has 2 units of CAP1400 under construction since 2019 .
- Shidao Bay II-1 and Shidao Bay II-2.
- Don’t confuse them with the new unit 1 Hualong One at the same plant.
- They are different Units at the same site. 2001:B011:C008:9DD5:ADD8:E832:F012:F34A (talk) 15:45, 29 July 2024 (UTC)
Zhangzhou 4 under construction
https://www.world-nuclear-news.org/articles/fourth-unit-at-zhangzhou-under-construction — Preceding unsigned comment added by 2001:B011:C008:7D54:319E:CFAA:C6BE:3D40 (talk) 15:03, 27 September 2024 (UTC)
- South Korea's Shin Hanul nuclear power plant, start of construction of units 3 and 4 at the plant.
- https://www.world-nuclear-news.org/articles/south-korea-breaks-ground-for-two-new-reactors 2001:B011:C008:B60B:412E:E812:7A8B:EFFD (talk) 15:27, 30 October 2024 (UTC)
Sorting tables by dates leaves them out of order.
[edit]Sorting the rows of the tables by date does not work. How can we fix this? 2601:42:C07F:6560:4D2B:141:548E:92A8 (talk) 19:04, 20 April 2024 (UTC)
- This works for me, can you point out the specific table where it's not working? --Ita140188 (talk) 07:17, 23 April 2024 (UTC)